Saturday, January 31, 2015

Beginning of my cross section. The base of my building is around 669' so there is going to be a lot added to this layout. 

cross section justin

Here I have the office cubicles started.  They take a very long time to render so it's been a long process.  I am beginning to work on the large meeting room, the kitchen and bathroom, and the elevators.

Thursday, January 29, 2015

Cylindrical Skyscrapers



This is the start of the cross section for my cylindrical skyscraper. Although this is the top and smallest teir of my building, it is still quite large and has approximately 60 prison cells on each floor. 

Bathrooms in the Dumbbell Building (Connor Hall)

The bathrooms are going in. 4 Toilets and 2 Sinks for this bathroom. Almost done, looking good.
Finally started my cross section with the elevator shaft in the middle of the circle. Still need to improve the aesthetic of the cross section.

Saturday, January 24, 2015

Camber Building Cross Section

I have started to working on the cross-section to the camber building. All the wall have the appropriate width and hieght. The next step is to insert doors, elivators, ect.

Wednesday, January 21, 2015

First draft (Room setup) Michael Leong

Didn't have much to do and since i didn't want to work on other walls in the building i started working on what one of the rooms would look like. It isn't done sine i need to figure out how to put the doors in but here it is.

Friday, January 16, 2015

cross section

Here is the beginning of my cross section.  I am making progress.

Camber Building Facade

Here is the final facade of my building. Now I will start to recreate my cross section on sketch up.

Thursday, January 15, 2015

done with facade of building

Done with the facade of my building. Was held back because i got a new computer. I have no idea how I'm going to get the fan in in the middle of the building. #challengeaccepted

Michael Leong Cross section Post 1

Started working on the cross section of one of the upper floors of the hotel. Didn't bring the specs with me so i could only do so much... Should start working on the interior soon.

Dumbbell Building Cross Section (Connor Hall)

Starting the Cross Section for the Dumbbell Building. Bam.

Monday, January 12, 2015

Cylindrical Skyscraper



It has been a long time coming, but the exterior of my cylindrical skyscraper is 90% complete. Antennas and landscaping are next, then on to the cross-section! 


I can't move the imported models to save my life, let alone put them on my building. At least i improved some windows. Not much else done

Friday, January 9, 2015

i am trying to start the top of the building which spirals on top.

Camber Building D'Amato

I have made floors and replicated windows to my building. I still need to push the Soapskin Bubble Skins out to make the building flush. Also, with some first and second floor work i will be close to copying and pasting the building to create a replica tower.

Cylindrical Skyscraper



With lots of help from Mr. Ford, my cylindrical skyscraper is starting to take place. It took lots of trial and error from both of us to come up with a consistent way to slant the roof of each tier of my skyscraper. 

Thursday, January 8, 2015

Connor Hall Dumbbell Building

The windows are done on the Dumbbell Building (Making a parking lot on the left)